Introduction:
The name Brusubi is taken from the first
syllables
of the 3 resorts &
villages
which surround the are which are Brufut,
Sukuta & Bijilo.
The Brusubi Layout Housing Project is 12 kilometres from Banjul
& 4 kilometres from Serrekunda areas of The Gambia.
The real estate covers a land area of 356 hectares and is a short
distance to Brufut Heights and the Coral Beach Hotel. The idea
behind the project is to keep in line with the Vision 2020 and
aims to provide houses for sale in several project phases to a
good number of Gambians both at home and abroad.
The Infrastructure:
In Phase 1, tarmac roads have been constructed to facilitate movement
within the estate. Pipe borne water is also provided 1 metre into
each of the plots. All the mains electricity supplies have been
installed including street lights, poles and a 500 Kva modern
power substation.
Structures are in place to allow for the easy drainage of rain
water to prevent flooding. Road kerbs and culverts have been built
as part of the construction works.
Social Facilities:
Like any urban settlement, Brusubi has all the facilities that
make living in a city worth the while. There are schools, health,
social, sports, business and other essential services for for
families and individuals.
Properties For Sale:
There are a range of financing options from which interested buyers
can choose. That notwithstanding, the finance corporation remains
flexible for buyers who have their own building plans. They offer
2 and 3 bedroom houses at reasonable prices.
Typical land sizes in Brusubi are 20 x 25 sq. metres.
Building Contractors:
Three established building contractors were involved in the construction
of the houses under Phase 1. This way buyers have the opportunity
to choose from these proven building firms based in The Gambia.
Arrangement:
To buy one of these houses you need to procure, fill and submit
a prescribed application form and enter into a home loan agreement
with the SSHFC based in Gambia.
Payment schedule as follows: • 25%
of total house cost as advance. •
25% after walling. •
25% after roofing, doors & windows.
• 25% when all works are complete
and prior to handing over of the keys and title documents.
*NB The above maybe out of date so do check with the appropriate
authorities.
|
|
|
|